4.11 Bypass System Equipment Erection

Applicable scope:applicable to bypass system equipment erection,with the following inspection items:HP bypass system equipment erection,LP bypass system equipment erection,Erection of steam exhaust device connected to condenser.

4.11.1 HP bypass system equipment erection inspection and acceptance are given in Table 4.11.1.

Table 4.11.1 HP bypass system equipment erection

img

Table 4.11.1(Continued)

img

4.11.2 LP bypass system equipment erection and acceptance are given in Table 4.11.2.

Table 4.11.2 LP bypass system equipment erection

img

4.11.3 Erection of steam exhaust device connected to condenser inspection and acceptance are given in Table 4.11.3.

Table 4.11.3 Erection of steam exhaust device connected to condenser

img

4.11.4 Mandatory implementation inspection of bypass system equipment erection subsection project in Table 4.11.4.

Table 4.11.4 Mandatory implementation inspection table of bypass system equipment erection subsection project

img

Table 4.11.4(Continued)

img