更新时间:2020-09-25 15:30:16
封面
版权信息
Announcement of Ministry of Housing and Urban-Rural Development of the People's Republic of China
Foreword
1 General Provisions
2 Basic Requirements
3 Mobilization of Equipment and Materials
3.1 Equipment Mobilization
3.2 Material Mobilization
4 Equipment Installation
4.1 General Requirements
4.2 Equipment Foundation
4.3 Base Line and Base Point for Equipment Installation
4.4 Anchor Bolt
4.5 Shim
4.6 Oil Tank
4.7 Cooler and Steam Heater
4.8 Filter
4.9 Accumulator
4.10 Pump and Pump Set
4.11 Complete Set of Hydraulic(Lubrication)Station
4.12 Valve Stand and Valve
4.13 Oil Purifier
4.14 Lubrication Grease Pump Station,Oil Filler and Oil Distributor
4.15 Water-separating Gas Filter,Atomized Lubricator(Oil Separator)and Control Valve
5 Pipe Processing and Installation
5.1 General Requirements
5.2 Pipe Processing
5.3 Pipe Welding
5.4 Pipe Pickling
5.5 Pipe Installation
6 Pipe Flushing,Purging and Pressure Test
6.1 Pipe Flushing
6.2 Pipe Purging
6.3 Pipe Pressure Test
7 Commissioning and Test Run
7.1 General Requirements
7.2 Commissioning and Test Run of Hydraulic System
7.3 Commissioning and Test Run of Lubrication Oil System
7.4 Commissioning and Test Run of Lubrication Grease System
7.5 Commissioning and Test Run of Oil Mist Lubrication System
7.6 Commissioning and Test Run of Process Lubrication System
7.7 Commissioning and Test Run of Pneumatic System
8 Pipe Painting
9 Safety and Environmental Protection
Explanation of Wording in This Code
Normative Standard
Explanation of Provisions
Statement on Preparation