Foreword
This Part is formulated according to the requirements of Document Guo Neng Ke Ji[2009]No.163 issued by the Professional Technical Committee on Thermal Power Construction of Standardization Administration of China--"Notice on Executing the Development(Revision)Program of Professional Energy Standards for the First Stage in 2009",in association of relevant organizations.
DL 5190"Technical Specification for Thermal Power Erection and Construction"consists of the following 9 parts:
DL 5190.1 Part 1:Civil Work
DL 5190.2 Part 2:Boiler Unit
DL 5190.3 Part 3:Steam Turbine Generator Units
DL 5190.4 Part 4:Instrumentation and Control
DL 5190.5 Part 5:Piping and System
DL 5190.6 Part 6:Water Treatment and Hydrogen Generation Equipment and System
DL 5190.7 Part 7:Welding
DL 5190.8 Part 8:Processing Preparation
DL 5190.9 Part 9:Hydro-structure
This Part is the eighth part"Processing Preparation"((hereinafter referred to as"this Part")of DL/T 5190.
The main contents of this Part include:General Provisionos,Basic Requirements,Material Inspection and Storage,Air&Flue Gas Ducts/Raw Coal&Pulverized Coal Piping and Parts,Steam/Water Pipelines and Parts,Steel Welding Atmospheric Vessels,Metal Components,Other,Project Documents to be Provided Before Quality Acceptance and List of Reference Standards.In this Part,Articles 7.3.5,7.3.6,7.3.7 and 7.3.8 printed in bold type are compulsory provisions and must be enforced strictly.
This Part was proposed by the China Electricity Council.
This Part is under the jurisdiction of the Professional Technical Committee on Thermal Power Construction of Standardization Administration of China.
Chief Development Organizations:
Anhwei Electric Power Construction No.1 Company and Hebei No.2 Electric Power
Construction Company
Participating Development Organization:
Sichuan No.3 Electric Power Construction Company
Chief Drafting Staff:
Liang Binghai Li Chuanyu Yang Liancun Zhang Xiaodong Yang Baojian
Bai Yonggang Lan Hua Mao Xudong Li Shuangguo Shi Guangqin
Chief Examiners:
Huo Li Zhou Defu Yang Hangge Jin Xudong Shi Yucheng Shao Zhifan
Zhang Ping Xue Zhiqiang Wang Hongdong Zhao Jun Han Qihua
Dong Huashan Qian Haiping Xu Zhigang Feng Zhongpei Gu Xiangqi
Wan Wei Li Yunhao Liu Shougui Li Weimin Yang Hejun.
During the process of implementing this Part,relevant opinions and advices,whenever necessary,can be fed back to the China Electricity Council Standardization Center(Address:No.1,Baiguang Road Ertiao,Beijing,100761,China).