4.4 Steam Turbine Proper Erection

4.4.1 Bearing pedestal and pad erection.

Applicable scope:applicable to erection of ST proper bearing,thrust bearing,bearing pedestal,with the following inspection items:bearing pedestal in place and alignment,pad and oil baffle gap adjustment,thrust bearing gap adjustment,bearing pedestal covering.

1 Bearing pedestal in place and alignment inspection and acceptance are given in Table 4.4.1-1.

Table 4.4.1-1 Bearing pedestal in place and alignment

img

2 Bearing pad and oil baffle gap measurement and adjustment inspection and acceptance are given in Table 4.4.1-2.

Table 4.4.1-2 Measurement and adjustment of gap between bearing pad and oil Baffle

img

Table 4.4.1-2(Continued)

img
img

Fig.4.4.1-2 Gap between bearing pad and oil baffle

3 Thrust bearing gap measurement,adjustment inspection and acceptance are given in Table 4.4.1-3.

Table 4.4.1-3 Thrust bearing gap measurement and adjustment

img

Table 4.4.1-3(Continued)

img

4 Bearing pedestal covering inspection and acceptance are given in Table 4.4.1-4.

Table 4.4.1-4 Bearing pedestal covering

img

4.4.2 Cylinder cleaning and inspection

Applicable scope:applicable to ST proper cylinder and rotor cleaning and inspection,with the following inspection items:LP cylinder cleaning and inspection,HP/IP cylinder cleaning and inspection,Inner casing steam admission pipe cleaning and inspection,HP/IP cylinder nozzle chamber,diaphragm(carrier ring),steam seal(bushing)inspection,LP cylinder steam admission chamber,diaphragm(carrier ring),steam seal(bushing)inspection.

1 LP cylinder cleaning and inspection and acceptance are given in Table 4.4.2-1.

Table 4.4.2-1 LP cylinder cleaning and inspection

img

2 HP/IP cylinder cleaning and inspection and acceptance are given in Table 4.4.2-2.

Table 4.4.2-2 HP/IP cylinder cleaning and inspection

img

3 HP-IP inner casing steam admission pipe cleaning and inspection and acceptance are given in Table 4.4.2-3.

Table 4.4.2-3 Cleaning and inspection of HP-IP inner casing steam admission pipes

img

Table 4.4.2-3(Continued)

img

2 HP/IP cylinder nozzle chamber,diaphragm(carrier ring),steam seal(bushing)inspection and acceptance are given in Table 4.4.2-4.

Table 4.4.2-4 Inspection of HP/IP cylinder nozzle chamber,diaphragm(carrier ring),seal(bushing)

img

Table 4.4.2-4(Continued)

img

5 LP cylinder steam admission chamber,Diaphragm(carrier ring),steam seal(bushing)inspection and acceptance are given in Table 4.4.2-5.

Table 4.4.2-5 Inspection of LP cylinder nozzle chamber,diaphragm(carrier ring),seal(bushing)

img

Table 4.4.2-5(Continued)

img

4.4.3 ST rotor inspection and acceptance are given in Table 4.4.3.

Table 4.4.3 ST rotor inspection

img

Table 4.4.3(Continued)

img

4.4.4 Cylinder assembly in place

Applicable scope:Applicable to ST proper LP cylinder and HP/IP cylinder assembly,jointing surface gap inspection and cylinder in place and alignment,with the following inspection items:LP cylinder assembly,jointing surface gap inspection,HP/IP cylinder assembly,jointing surface gap inspection,cylinder in place and alignment.

1 LP cylinder assembly,jointing surface gap inspection and acceptance are given in Table 4.4.4-1.

Table 4.4.4-1 LP Cylinder assembly and joint surface gap inspection

img

Table 4.4.4-1(Continued)

img

2 HP/IP cylinder jointing surface gap inspection and acceptance are given in Table 4.4.4-2.

Table 4.4.4-2 HP/IP cylinder joint surface gap inspection

img

3 Cylinder in place and alignment inspection and acceptance are given in Table 4.4.4-3.

Table 4.4.4-3 Cylinder in place and alignment

img

Table 4.4.4-3(Continued)

img

4.4.5 Cylinder internal parts assembly erection.

Applicable scope:Applicable to ST proper cylinder internal parts assembly erection,with the following inspection items:1bearing pad bearing pedestal and cylinder and rotor centering,2 LP Inner casing erection,3HP/IP inner casing erection,4 HP nozzle chamber erection,5 HP/IP cylinder diaphragm(carrier ring),balance piston(ring),admission shunt ring,steam seal bushing erection,7 LP cylinder internal part groove centering,8 HP/IP cylinder internal part groove centering

1 Bearing pedestal,cylinder and rotor centering inspection and acceptance are given in Table 4.4.5-1.

Table 4.4.5-1 Centering of bearing pedestal,cylinder and rotor

img

Table 4.4.5-1(Continued)

img

2 LP inner casing erection inspection and acceptance are given in Table 4.4.5-2.

Table 4.4.5-2 LP inner casing erection

img

Table 4.4.5-2(Continued)

img

3 HP/IP inner casing erection inspection and acceptance are given in Table 4.4.5-3.

Table 4.4.5-3 HP/IP inner casing erection

img

4 HP nozzle chamber erection inspection and acceptance are given in Table 4.4.5-4.

Table 4.4.5-4 Erection of HP nozzle chamber

img

Table 4.4.5-4(Continued)

img

5 HP/IP cylinder diaphragm(carrier ring),balance piston(ring),admission shunt ring,steam seal bushing erection inspection and acceptance are given in Table 4.4.5-5.

Table 4.4.5-5 Erection of HP/IP diaphragm(carrier ring),balance piston(ring),admission shunt ring,Seal bushing

img

6 LP cylinder diaphragm(carrier ring),balance piston(ring),admission shunt ring,steam seal bushing erection inspection and acceptance are given in Table 4.4.5-6.

Table 4.4.5-6 Erection of LP diaphragm(carrier ring),balance piston(ring),admission shunt ring,seal bushing

img

7 LP cylinder internal part groove centering inspection and acceptance are given in Table 4.4.5-7.

Table 4.4.5-7 Centering of LP cylinder internal part groove

img

Table 4.4.5-7(Continued)

img

8 HP/IP cylinder internal part groove centering inspection and acceptance are given in Table 4.4.5-8.

Table 4.4.5-8 Centering of HP/IP cylinder internal part groove

img

4.4.6 Cylinder load distribution inspection and acceptance are given in Table 4.4.6.

Table 4.4.6 Cylinder Load Distribution

img

4.4.7 Flow path clearance measurement and adjustment inspection and acceptance are given in Table 4.4.7.

Table 4.4.7 Flow path clearance measurement and adjustment

img

Table 4.4.7(Continued)

img

4.4.8 Steam seal gap measurement and adjustment inspection and acceptance are given in Table 4.4.8.

Table 4.4.8 Steam seal gap measurement and adjustment

img

Table 4.4.8(Continued)

img

4.4.9 ST covering.

Applicable scope:applicable to ST covering,with the following inspection items:inspection before ST covering,ST covering.

1 Inspection and acceptance of ST covering are given in Table 4.4.9-1.

Table 4.4.9-1 Inspection prior to steam turbine covering

img

Table 4.4.9-1(Continued)

img

2 ST covering inspection and acceptance are given in Table 4.4.9-2.

Table 4.4.9-2 Steam turbine covering inspection

img

Table 4.4.9-2(Continued)

img

4.4.10 Shafting adjustment and connection.

Applicable scope:applicable to shafting adjustment and connection,with the following inspection items:coupling centering,coupling reaming connection.

1 Coupling centering inspection and acceptance are given in Table 4.4.10-1.

Table 4.4.10-1 Coupling centering

img

Table 4.4.10-1(Continued)

img

2 Coupling reaming connection inspection and acceptance are given in Table 4.4.10-2.

Table 4.4.10-2 Coupling reaming connection

img

Table 4.4.10-2(Continued)

img

4.4.11 Sliding pin system gap measurement and adjustment.

Applicable scope:applicable to sliding pin system gap measurement and adjustment,with the following inspection items:sliding pin system gap adjustment,bearing pedestal and cylinder centering girder erection,3 push and pull device erection.

1 Sliding pin system gap measurement and adjustment inspection and acceptance are given in Table 4.4.11-1.

Table 4.4.11-1 Sliding pin system gap measurement and adjustment

img

Table 4.4.11-1(Continued)

img
img

Fig.4.4.11

2 Bearing pedestal and cylinder centering girder erection inspection and acceptance are given in Table 4.4.11-2.

Table 4.4.11-2 Erection of centering girder between pedestal and cylinder

img

3 Push-pull device erection inspection and acceptance are given in Table 4.4.11-3.

Table 4.4.11-3 Erection of push-pull device

img

Table 4.4.11-3(Continued)

img

4.4.12 Turning gear inspection and erection.

Applicable scope:applicable to turning gear inspection and erection,with the following inspection items:turning gear cleaning inspection,turning gear assembly.

1 Turning gear cleaning inspection and acceptance are given in Table 4.4.12-1.

Table 4.4.12-1 Turning gear cleaning

img

2 Turning gear assembly inspection and acceptance are given in Table 4.4.12-2.

Table 4.4.12-2 Turning gear assembly

img

4.4.13 IP-LP cylinder crossover pipe erection inspection and acceptance are given in Table 4.4.13.

Table 4.4.13 Erection of IP-LP crossover pipe

img

4.4.14 Inspection before thermal insulation of cylinder,main stop valve and regulation valve inspection and inspection and acceptance of ST generator lagging enclosure erection are given in Table 4.4.14.

Table 4.4.14 Inspection before ST thermal insulation and lagging enclosure erection

img

4.4.15 Mandatory implementation inspection table of foundation preparation,iron cushion(block)machining before erection of ST generator are given in Table 4.4.15.

Table 4.4.15 Mandatory provision implementation inspection table of foundation preparation,iron cushion(cushion block)machining prior to erection of steam turbine generator

img

Table 4.4.15(Continued)

img

4.4.16 Mandatory provision implementation inspection of steam turbine proper erection in subsection project is given in Table 4.4.16.

Table 4.4.16 Mandatory provision implementation inspection table of steam turbine proper erection in subsection project

img

Table 4.4.16(Continued)

img

Table 4.4.16(Continued)

img

Table 4.4.16(Continued)

img

Table 4.4.16(Continued)

img