DL/T5210.3-2009电力建设施工质量验收及评价规程第3部分:汽轮发电机组(英文版)
上QQ阅读APP看本书,新人免费读10天
设备和账号都新为新人

4.3 General Part of ST Generator Unit

ST generator foundation preparation

Applicable scope:foundation inspection preparation before ST generator proper erection,with the following inspection items:foundation inspection and geometric dimension check,foundation bearing face chipping,erection of internal baffle plate for secondary grouting,foundation bolt inspection.

4.3.1 Foundation inspection and geometric dimension check inspection and acceptance are given in Table 4.3.1.

Table 4.3.1 Foundation Inspection and Geometric Dimension Check

img

Table 4.3.1(Continued)

img

4.3.2 Foundation bearing face chipping inspection and acceptance are given in Table 4.3.2.

Table 4.3.2 Foundation bearing face chipping

img

4.3.3 Erection of internal baffle plate for secondary grouting inspection and acceptance are given in Table 4.3.3.

Table 4.3.3 Erection of internal baffle plate for secondary grouting

img

4.3.4 Foundation bolt inspection and acceptance are given in Table 4.3.4.

Table 4.3.4 Foundation bolt inspection

img

4.3.5 Ordinary iron cushion machining inspection and acceptance are given in Table 4.3.5.

Table 4.3.5 Ordinary iron cushion machining

img

4.3.6 Iron cushion erection inspection and acceptance are given in Table 4.3.6.

Table 4.3.6 Iron cushion erection

img

Table 4.3.6(Continued)

img

4.3.7 Concrete block machining inspection and acceptance are given in Table 4.3.7.

Table 4.3.7 Concrete block machining

img

4.3.8 Erection of adjustable fixator inspection and acceptance are given in Table 4.3.8.

Table 4.3.8 Erection of adjustable fixator

img

4.3.9 Erection of sole plate adjusting screw inspection and acceptance are given in Table 4.3.9.

Table 4.3.9 Erection of sole plate adjusting screw

img

4.3.10 Sole plate inspection and erection inspection and acceptance are given in Table 4.3.10.

Table 4.3.10 Sole plate inspection and erection

img

Table 4.3.10(Continued)

img

4.3.11 Inspection and acceptance before ST generator unit foundation secondary grouting are given in Table 4.3.11.

Table 4.3.11 Inspection before ST generator unit foundation secondary grouting

img

4.3.12 ST generator unit foundation secondary grouting and curing inspection and acceptance are given in Table 4.3.12.

Table 4.3.12 ST Generator unit foundation secondary grouting and curing

img

4.3.13 Foundation settlement observation inspection and acceptance are given in Table 4.3.13.

Table 4.3.13 Foundation settlement observation

img

4.3.14 Bearing pedestal cleaning and inspection and acceptance are given in Table 4.3.14.

Table 4.3.14 Bearing pedestal cleaning and inspection

img

Table 4.3.14(Continued)

img

4.3.15 Bearing pad inspection and acceptance are given in Table 4.3.15.

Table 4.3.15 Brearing pad inspection

img

Table 4.3.15(Continued)

img

4.3.16 Bearing pad block inspection and acceptance are given in Table 4.3.16.

Table 4.3.16 Bearing pad cushion block inspection

img

4.3.17 Recheck and acceptance of alloy steel parts are given in Table 4.3.17.

Table 4.3.17 Recheck of alloy steel parts

img

4.3.18 Auxiliary equipment and machinery foundation preparation inspection and acceptance are given in Table 4.3.18.

Table 4.3.18 Auxiliary equipment and machinery foundation preparation

img

Table 4.3.18(Continued)

img

4.3.19 Inspection and acceptance of iron cushion and foundation bolt erection for auxiliary equipment and machinery are given in Table 4.3.19.

Table 4.3.19 Iron cushion and foundation bolt erection for auxiliary equipment and machinery

img

Table 4.3.19(Continued)

img

4.3.20 Auxiliary equipment and machinery secondary grouting inspection and acceptance are given in Table 4.3.20.

Table 4.3.20 Auxiliary equipment and machinery secondary grouting

img

Table 4.3.20(Continued)

img

4.3.21 Auxiliary machinery bearing pedestal erection inspection and acceptance are given in Table 4.3.21.

Table 4.3.21 Auxiliary machinery bearing pedestal erection

img

4.3.22 Inspection and acceptance of sliding bearing inspection and erection are given in Table 4.3.22.

Table 4.3.22 Auxiliary machinery sliding bearing inspection and erection

img

Table 4.3.22(Continued)

img

4.3.23 Inspection and acceptance of roller bearing inspection and erection inspection are given in Table 4.3.23.

Table 4.3.23 Auxiliary machinery roller bearing inspection and erection

img

Table 4.3.23(Continued)

img

4.3.24 Ordinary horizontal centrifugal pump inspection and acceptance are given in Table 4.3.24.

Table 4.3.24 Ordinary horizontal centrifugal pump inspection

img

4.3.25 Ordinary horizontal centrifugal pump erection inspection and acceptance are given in Table 4.3.25.

Table 4.3.25 Ordinary horizontal centrifugal pump erection

img

Table 4.3.25(Continued)

img

4.3.26 Horizontal centrifugal pump trial run inspection and acceptance are given in Table 4.3.26.

Table 4.3.26 Horizontal centrifugal pump trial run

img

Table 4.3.26(Continued)

img

4.3.27 Ordinary vertical pump inspection and acceptance are given in Table 4.3.27.

Table 4.3.27 Ordinary vertical pump inspection

img

Table 4.3.27(Continued)

img

4.3.28 Ordinary vertical pump erection inspection and acceptance are given in Table 4.3.28.

Table 4.3.28 Ordinary vertical pump erection

img

4.3.29 Ordinary vertical pump trial run inspection and acceptance are given in Table 4.3.29.

Table 4.3.29 Ordinary vertical pump trial run

img

Table 4.3.29(Continued)

img

4.3.30 Ordinary fan erection inspection and acceptance are given in Table 4.3.30.

Table 4.3.30 Ordinary fan erection

img

4.3.31 Fan trial run inspection and acceptance are given in Table 4.3.31.

Table 4.3.31 Fan trial run

img

4.3.32 Auxiliary machinery coupling assembly and centering inspection and acceptance are given in Table 4.3.32.

Table 4.3.32 Auxiliary machinery coupling assembly and centering

img

Table 4.3.32(Continued)

img

4.3.33 Container type equipment erection inspection and acceptance are given in Table 4.3.33.

Table 4.3.33 Integrated equipment erection

img

Table 4.3.33(Continued)

img

4.3.34 Ordinary heat exchanger inspection and acceptance are given in Table 4.3.34.

Table 4.3.34 Ordinary heat exchanger inspection

img

4.3.35 Ordinary heat exchanger erection inspection and acceptance are given in Table 4.3.35.

Table 4.3.35 Ordinary heat exchanger erection

img

4.3.36 Ordinary tank erection inspection and acceptance are given in Table 4.3.36.

Table 4.3.36 Ordinary tank erection

img

Table 4.3.36(Continued)

img

4.3.37 Inspection and acceptance of metal parts,steel platform,ladder,rail and cover plate fabrication and erection are given in Table 4.3.37.

Table 4.3.37 Metal parts,steel platform,ladder,rail and cover plate fabrication and erection

img

Table 4.3.37(Continued)

img

4.3.38 Gear(worm)reducer,increaser inspection and acceptance are given in Table 4.3.38.

Table 4.3.38 Gear(Worm)reducer,increaser inspection

img

Table 4.3.38(Continued)

img

4.3.39 ST generator unit ordinary equipment erection mandatory provision implementation and inspection are given in Table 4.3.39.

Table 4.3.39 Mandatory provision implementation inspection table of(  )subsection project

img