Foreword
This code was jointly developed by Capital Engineering and Research Incorporation Limited and relevant units according to the requirements of Jian Biao[2008]No.105 Document Notice on Printing the Development and Revision Plan(the Second Batch)of National Engineering Construction Standards in 2008 issued by Ministry of Housing and Urban-Rural Development of the People's Republic of China(MOHURD)."
During the development of this code,the development group followed the relevant national basic construction guideline and industrial policies,conducted relevant investigation and data collection in the selected iron and steel works,summed up the experiences of design units and manufacturers of the iron and steel industry in recent years,and widely solicited the opinions of experts,scholars and designers of relevant design units,scientific research units,companies and other organizations all over the country,meanwhile,studied and digested the latest foreign design achievements,and finalized the draft through serious study,careful analysis and several amendments.
This code comprises 12 chapters and 2 appendixes with the main contents as follows:General Provisions,Terms,Basic Requirements,Furnace non-standard equipment,Steel Structure,Refractory Construction,Piping of combustion,Compressed Air and Cooling Water System,Evaporative Cooling Device,Hydraulic and Lubrication System,Electric automation,Final acceptance test,Safety and Environmental Protection,etc.
The provisions printed in bold type in this code are compulsory ones and must be enforced strictly.
MOHURD is in charge of the administration of this code and the explanation of the compulsory provisions,while China Metallurgical Construction Association in charge of the routine management,and Capital Engineering and Research Incorporation Limited in charge of the explanation of specific technical contents.All relevant organizations are kindly requested to sum up experiences and accumulate data in your actual practices during the process of implementing this code.The comments and suggestions,whenever necessary,can be posted or passed on to Capital Engineering and Research Incorporation Limited(Address:No.7 Jiananjie,Beijing Economic-Technological Development Area Post Code:100176)to provide reference for future revision.
Chief Development Organization,Participating Development Organizations,Chief Drafting Staff and Chief Reviewers of this code are as follows:
Chief Development Organization:
Capital Engineering and Research Incorporation Limited
Participating Development Organizations:
CISDI Engineering Co.,LTD.
WISDRI Engineering and Research Incorporation Limited
Huatian Engineering and Technology Corporation
Beijing Shougang Construction Group Co.,Ltd.
China First Metallurgical Construction Group Corporation Ltd
Ansteel Construction Group Co.Ltd
Yangzhou Leader Engineering Technologies Co.Ltd.
Chief Drafting Staff:
Hu Wenchao Xu Chungang Fu Yongtao Li Jing Jiang Anjia
Wang Lihong Yang Santang Liang Wei Guo Guangming Huo Hang
Yan Yunfu Luo Jianming Xu Shaochun Wei Zeen Ye Chenglong
Wang Jing Jia Ding Song Ping Han Youling Lu Dacheng
Gong Jinguo Tian Xuebin Yang Jianxin Wu Zhenhai Zou Shounan
Chief Reviewers:
Cai Jiuju Fu Guoli Yin Zhiping Tang Weihong Liu Xuemin
Li Mingzhu Luo Jin Huang Xialan Qin Jianchao Lu Yan
Tan Weiyi Meng Zhixiang Cheng Shuming Dai Hong Yang Weiling
Xue Xiuzhang