Foreword

Specification for construction quality checkout and evaluation of electric equipment installation is a series of standards for construction quality checkout,acceptance and evaluation of electric equipment installation.

The set of standards is comprised of the following 17 parts:

—Part 1:General rules;

—Part 2:High-voltage electric equipments;

—Part 3:Power transformers,oil-immersed type reactors and instrument transformers;

—Part 4:Busbar equipments;

—Part 5:Power cable lines;

—Part 6:Grounding devices;

—Part 7:Rotating electrical machines;

—Part 8:Panels,cabinets and secondary circuit wirings;

—Part 9:Batteries;

—Part 10:35kV and below over-head power line installation;

—Part 11:Elevator;

—Part 12:Low-voltage apparatus;

—Part 13:Power converter equipments;

—Part 14:Cranes;

—Part 15:Electric equipments in explosive or inflammable hazardous environment;

—Part 16:1kV and under feeder cable engineering;

—Part 17:Electric lighting devices.

This part is the tenth part of the series of standards:35kV and below over-head power line installation,which is prepared on the basis of Notice on project confirmation of Electric Power Industry Standard Preparation and Revision in 1999(Electric Power[2000]No.22)confirmed by State Economic and Trade Commission.

This part is the tabular form of GB 50173-1992 Electric equipment installation engineering Code for construction and acceptance of 35kV and below over-head power line installation and related national standards and industry-standard,which is an electric power industry standard applied to Quality checkout of 35kV and below over-head power line installation.

This standard was both proposed by and under the jurisdiction of China Electric Power Research Institute.

Chief Development Organization:

      China Electric Power Research Institute

Participating Development Organization:

      The First Electric Power Construction Company of Jiangsu Province

Chief Drafting Staff:

      Yuan Jijun Gong Jianhua Jian Hancheng

China Electric Power Research Institute is responsible for the explanation of this standard.