GB50713-2011板带精整工艺设计规范(英文版)
上QQ阅读APP看本书,新人免费读10天
设备和账号都新为新人

Foreword

According to the requirements of(Document Jian Biao[2008]No.105)"Notice on Printing and Distributing the Development and Revision Plan of Construction Standards and Codes in 2008(Batch 2)"issued by the Ministry of Housing and Urban-Rural Development of the People's Republic of China,this Code was developed by CISDI Engineering Co.,Ltd.together with the organizations concerned.

During the drafting process,the Code development teams have conducted thorough investigations and studies,carefully summarized practical experience,referred to the relevant international standards and foreign advanced standards,collected the suggestions and comments from the relevant parties through various channels and finalized the present version after full examination and approval.

This Code comprises 6 Chapters.The main technical contents are:General Provisions,Terms,Basic Requirements,Finishing Process of Plate,Finishing Process of Hot Rolled Wide Steel Strip and Finishing Process of Cold Rolled Wide Steel Strip.

The provisions printed in bold type are compulsory ones and must be enforced strictly.

The Ministry of Housing and Urban-Rural Development is in charge of the administration of this Code and the explanation of the compulsory provisions;and CISDI Engineering Co.,Ltd.is responsible for the explanation of specific technical contents.During the practical implementation of this Code,the opinions and suggestions,whenever necessary,can be posted to CISDI Engineering Co.,Ltd.(address:No.1,Shuanggang Road,Yuzhong District,Chongqing 400013,China)for reference in future revision.

The Chief Development Organization,Participating Development Organizations,Chief Drafting Staff and Chicef Examiners of this code are listed below:

Chief Development Organization:

CISDI Engineering Co.,Ltd.

Participating Development Organizations:

Capital Engineering & Research Incorporation Ltd.

WISDRI Engineering & Research Incorporation Limited

Huatian Engineering & Technology Corporation,MCC

Shanxi TISCO Engineering Co.,Ltd.

WISCO Designing Institute Co.,Ltd.

Pangang Group Designing Institute Co.,Ltd.

Shagang Group Co.,Ltd.

Chief Drafting Staff:

Xiao Jun Huang Bo Yu Hai Wang Junxiang Zhao Wenbo Fan Caibiao

Liao Yanlin Xu Yuemin Li Yuejian Wan Baoyuan Wang Jinghui Li Xiangdong

Mao Yibiao Bai Xiaojing

Chief Examiners:

Guo Qijiao Shao Yuanjing Cao Jianning Huang Chuanqing Tang Shunbao

Wang Ansu Yu Dan Wang Yeke Yang Chunmei