8.5 Special Roller Table
8.5.1 Installation for special roller table,such as tension roll,pinch roll,deflector roll,control roll,steering roll,dancer roll and so on shall meet the requirements of article 8.3.1 in this code.
1 Roller equipment installation shall meet the requirements of article 8.3.1 in this code.
2 Tension meter shall be provided with the same height of cushion blocks for alternately replacing when the tension roller is installed.Equipment such as pinch roll,control roll and steering roll,shall be installed and adjusted at neutral work position.
8.5.2 Allowable deviation for special roller table installation shall be in accordance with those specified in Table 8.5.2.
Table 8.5.2 Allowable deviation for special roller table installation
8.5.3 Allowable deviation for hold-down roll,acid scraper roll and squeeze roll installation shall be in accordance with those specified in Table 8.5.3.
Table 8.5.3 Allowable deviation for hold down roll,acid scraper roll and squeeze roll installation