GB 50825-2013 钢铁厂加热炉工程质量验收规范 (英文版)
上QQ阅读APP看本书,新人免费读10天
设备和账号都新为新人

6.4 Flue Lining

6.4.1 Quality of brickwork of the flue shall comply with the requirements in current national standard GB 50309 Code for Quality Inspection and Acceptance of Industrial Furnace Building.

6.4.2 The sequence of brickwork of flue:wall,dome,bottom and flue.

6.4.3 Quality inspection of the brickwork of flue shall comply with the requirements in current national standard GB 50309 Code for Quality Inspection and Acceptance of Industrial Furnace Building.