更新时间:2021-05-28 16:47:40
封面
书名页
版权页
Foreword
Notes on Revision
1 General Provisions
2 Terms and Symbols
3 Pre-Acceptance Inspection
3.1 Equipment Room Inspection
3.2 Tower and Mast Inspection
3.3 Cable Conduit and Cable Tray Inspection
3.4 Equipment Installation Inspection
3.5 Antenna and Feeder Inspection
3.6 Cable Laying Inspection
3.7 Power Supply System and Monitoring System Inspection
4 Preliminary Acceptance
4.1 Preliminary Acceptance Testing Requirements
4.2 Preliminary Acceptance Items
5 Commissioning
5.1 Commissioning Requirements
5.2 Monitored Items During Commissioning
6 Final Acceptance
6.1 As-Built Technical Documents
6.2 Acceptance Requirements and Contents
Appendix A Explanation of Wording in This Code
Appendix B Tables of Work Completion Acceptance
Explanation of Provisions